Governor AbdulRahman AbdulRazaq's Achievements in the Ministry of Water Resources - Good Nigeria

GoodNigeria.com : Good Nigeria News!

Kwara

Governor AbdulRahman AbdulRazaq’s Achievements in the Ministry of Water Resources

As the adage says, anything that has a beginning must have its stopping point – despite having an eventful and exciting time as the Commissioner of Water Resources in the state, like you all know, it has come to an end.

I see my time in office as a learning period, a privilege to serve my people, and contribute to the growth and development of our beloved state – which I hope I have been able to achieve.

A lot has been achieved during my time in office and I want to attribute all the achievements to the support I get from Kwarans (through sharing of information about the water condition in their environment and other aspects) because without them it can not be possible.

Here is what we have been able to achieve together during my one year stay as the Commissioner of Water Resources of the state.

  1. Rehabilitation of Lafiagi Water Works
  2. Rehabilitation of Asa-Dam Water Works
  3. Rehabilitation of Patigi Water Works
  4. Rehabilitation of Igbaja Water Works
  5. Rehabilitation of Kaiama Water Works
  6. Rehabilitation of Gwanara Water Works
  7. Reticulation of Golf Club
  8. Rehabilitation of UP Kwara Water Tanks across Ilorin Metropolis:

i. Garage Offa;
ii. Umoru Audi;
iii. Unity Road;
iv. Ahmadu Bello Way;
v. Sobi via Iyawo Poultry, Ilorin

  1. Refurbishment of Agbabiaka Water Tanks Ilorin
  2. Rehabilitation of Yashikira Waterworks
  3. Rehabilitation of Oro-Ago Water Works
  4. Inter-connection of Eastern Reservoir & Awolowo Road in Tanke
  5. Diversion of Ductile iron pipes across Alagbado stream
  6. Repair of Lafiagi Water Works and its environment
  7. Creation of a By-pass from Asa-Dam Water Works to Oke-Ose tank
  8. Repair of Works at Patigi Water Works and Extension
  9. Relocation of AC” Pipe along Baraje, Bababoko Area
  10. Provision of Water Supply to Ajibesin Community, Ogidi Area
  11. Reactivation of Blocked four fitter-Bed, Asa-Dam
  12. Repair of Share Waterworks
  13. Restoration of pipe borne water to:

i. Abata-Asunkere,
ii. Ayegbami,
iii. Alagbado &
iv. Harmony Estate

  1. Payment for the Completion of Rore Waterworks in Irepodun LG by Tafol Nig. Ltd
  2. Rehabilitation of Oyun Waterworks Lot 2
  3. Drilling of a motorized Borehole at Shuta Asa LG
  4. Provision of Industrial Boreholes in some Communities in Baruten LG:

i. Okuta;
ii. Boriya;
iii. Gure;
iv. Kosubosu;
v. Gwasoro;
vi. Kenu;
vii. Taberu; sinau;
viii. Ningurume;
ix. Ilesha-Baruba;
x. Shiya

  1. Drilling of motorized Boreholes in Isale-Koko,

i. Amule/Baruba and
ii. Ita-Elepa/Offa-Garrage

  1. Rehabilitation of Igbaja Water Works supplementary bid
  2. Drilling of a motorized Borehole at Aliara, Ilorin West LG
  3. Repairs & Drilling of motorized Borehole in Asa LG:

i. Eiyekorin;
ii. Afon;
iii. Apata-Onire (Alapa);
iv. Foko;
v. Ogbondoroko;
vi. Apate-Onire;
vii. Gaa-Bororo;
viii. Oja-Iya;
ix. Lapangba
x. (Repair – Ojakoro;
xi. kolofo;
xii. Olupo town;
xiii. Budogbo;
xiv. Gaa-turawa;
xv. Binna;
xvi. Gaa-Laloke;
xvii. Abuyarin;
xviii. Gbofe;
xix. Bi-Elesin;
xx. Owode-oja;
xxi. Olorunda;
xxii. Lasoju;
xxiii. Araromi village;
xxiv. Budo Oke;
xxv. Popo village;
xxvi. Ayetoro-Otte Oja;
xxvii. Budo-Awero;
xxviii. Ajuwon;
xxix. Gaa-Obatte)

  1. Drilling of (5) motorized Boreholes in Kaiama LG:

i. Kaiama Ward II;
ii. Gwanabe Ward I;
iii. Tenebo Community,
iv. Kemanji;Berira Community;
v. Wajibe Ward Mallam Ayuba Mosque

  1. Rehabilitation of Concrete overhead tank across ilorin Metropoli:

i. Ogidi;
ii. Kongbari;
iii. Basin;
iv. Sango;
v. Oke-Apomu;
vi. Adangba;
vii. Idi-Ape;
viii. Surulere;
ix. Balogun Ajikobi;
x. Ita-Elepa/Ile-Labe (Isale Koto)
xi. Ile Elelu/Senni

  1. Repair of (20) existing Boreholes; Drilling of (4) Handpump & (5) motorized Boreholes in Ilorin East L.G.A:

i. Ile-ogun Oke-oyi;
ii. Ajelende;
iii. Agboge Alalubosa;
iv. Gambari ward II;
v. Akogun Apado;
vi. HB-Angua Gbadamu;
vii. Oyekan;
viii. Magaji Are II;
ix. Oju-Ekun;
x. (Repair- Idi-opopo Baruba;
xi. Woru-oja Apado;
xii. Panada Agbeyangi;
xiii. Oloro Ipanrin;
xiv. Maya ile-apa;
xv. Mubo Aree ward;
xvi. Awogbemi Gambari ward;
xvii. ilyas house Iponrin;
xviii. Iso-obi idi-ape;
xix. Ode Ajia mosque gambari;
xx. Ode Adua mosque;
xxi. Alabi-Alasa Ajegunle;
xxii. Powerful church Alalubosa;
xxiii. Idi-ape mosque;
xxiv. Ile Arolahun qtrs;
xxv. Apata Area Baruba;
xxvi. Abudu idi-Aro;
xxvii. Central mosque Oyun ward;
xxviii. Magaji orisunbare Oyun ward;
xxix. Abioye Block Oyun ward

  1. Repairs of 20 nos of existing Boreholes;

i. Drilling of 4 nos of New Handpump & 5 nos of New Motorized Boreholes in Moro LGA:
ii. MB- Kanbi/oloru ward;
iii. Ekejo (Bode Saadu ward);
iv. Alateko (Arobadi ward);
v. Eleja-Sulu (Lanwa ward);
vi. Paku Village (Ajanaku ward);
vii. HB-Ganbe Oloko (Lanwa ward);
viii. Apata-Oko Pakumoh;
ix. Faje-Eji (Dongari ward);
x. Alagogo Village (Malete ward)
xi. (Repairs- Baba Tapa Alfa-Ajanaku ward;
xii. Sumala-Okutala ward;
xiii. Aladiye-Ejidongari ward;
xiv. Ile kanisuru Shao ward;
xv. Ago Village-Jeunkunu ward;
xvi. Mazankore Village- Abati ward;
xvii. Adara village-Arobadi ward;
xviii. Shao police Station- Shao ward;
xix. Ojulogbo village- Abati ward;
xx. Gidaje Village-Abati ward;
xxi. Olowohanma village-Magida ward;
xxii. Tapa village-Jeunkunu ward;
xxiii. Jodoma-Baba Dudu ward;
xxiv. Gado-Ejidongari ward;
xxv. Iyana Bacita- Jebba ward;
xxvi. Malete Area-Bode Saadu ward;
xxvii. Amu village-Okutala ward;
xxviii. Agbaku Dende-Jebba ward;
xxix. Oladimeji-Ejidongari ward

  1. Drilling of 10,000 Litres Motorized Boreholes at Jengbe Motor Spare Part Market, Oloje
  2. Repair of Borehole at Kwara State Teaching Service Commission (KWTESCOM) Premises
  3. Provision of Generator-Set for recently rehabilitated Concrete Overhead Tank within Ilorin Metropoli:

i. Basin Road;
ii. Sango market;
iii. Ogidi; Ajikobi;
iv. Idi-Ape;
v. Oke-Apomu;
vi. Adangba; Surulere;
vii. Kongbari;
viii. Yidi-Praying ground;
i. Isale-Koko;
ii. Ile-Elelu

  1. Integrated Boreholes in Dumagi Waterworks
  2. Industrial Motorized Borehole in Edidi Communities
  3. Drilling of Motorized Boreholes for Awe & Olowo Communities in Asa LGA
  4. Drilling of 16 Hand Pump Boreholes to Fulani/Herdsman across 16 LGAs:

i. HB-Gidan-Ardo Okuta (Barutean);
ii. Tungan Darusalam (Kaiama);
iii. Gaa-Marafa (I/East);
iv. Gaa-Bamo Akanbi (I/South);
v. Gaa Alh. Ciroma Joruma (Asa);
vi. Gaa Alh. Saidu Osi (Ekiti);
vii. Gaa Alh. Jonwuro Omugo (Ifelodun);
viii. Gaa Ahmed Igbola (Irepodun);
ix. Gaa-Agunba Oke-Oyi (Isin);
x. Gaa Alh. Baji (Moro);
xi. Gaa Alh. Bello Idofin (Oke-Ero);
xii. Gaa Alfa Koro (Offa);
xiii. Gaa Alh. Ladi Ippe Warri (Oyun);
xiv. Gaa- Bokunji (Edu);
xv. Gaa- Aleyo (I/West);
xvi. Gaa-Sarkin Fulani Jae Bunaji (Patigi)

  1. Additional cost for the provision of 5 nos. Industrial boreholes & conversion of 4 Hand Pump to motorized in Moro LGA:

i. MB-Eleja-Sulu;
ii. Alate-Eko; Gambe-Oloko;
iii. Paku Village;
iv. Alagogo Village;
v. Ekejo; Faje-Eji;
vi. Kanbi/Oloru ward;
vii. Apata-Oko

  1. Construction of 10 nos. Hand fitted Boreholes in 5 L.Gs ( Asa, Barutean, Edu, Ifelodun & Oke-Ero):

i. Mobile Health Centre, Okuta &
ii. LGA Dispensary,Ilesha(Barutean);
iii. Maternity/Dispensary,Bacita
iv. LGA Dispensary Tsaragi (Edu);
v. Public Health Centre,Jimba-Oja
vi. Basic Health Centre, Alegongo (Ifelodun);
vii. Maternity/Dispensary, Laduba
viii. Public Health Centre, Agbona (Asa);
ix. Ekan Health Centre &
x. Imoji Health Centre (Oke-Ero)

  1. Purchase of repair materials for Kwara State Water Corporation (KWWC)
  2. Extension of Pipe-Borne Water to Royal Site;
  3. Extension of Pipe-Borne Water to Mountain View
  4. Repair of Isokan Community Water Distribution Pipe Line, Saw Mill Area, Ilorin.
  5. Procurement of water tankers for Kwara State Water Corporation
  6. Restoration of distribution line from Asamadiya to Awodi market.
  7. Creation of Distribution line to Abayawo community
  8. Restoration of Distribution line to Ita-Elepa, Agaka
  9. Supply of water to General Hospital
  10. Relocation of 12inch ductile iron pipe at Agba dam river.
  11. Provision of water to Sobi specialist hospital
  12. Restoration of concrete piling at Ola -Olu bridge
  13. Payment of April 2019 50% salary to Kwara State Water Corporation staff
  14. Provision of water to Odota
  15. Restoration of water to Niger road
  16. Restoration of water to Ita-Amodu

Related posts
EducationKwara

Uniilorin's Omotayo Dada, Becomings The Best Graduating Student Of Nigerian Law School 2022

Kwara

Herculean foundation supplies food items to Oke-Ode Residents

KwaraProudly Nigerian

Herculean Foundation Touching lives in Kwara State

Kwara

24-Year old Adeyi Kaosarah Appointed as Senior Special Assistant by Kwara State Governor

Sign up for our Newsletter and
stay informed

Leave a Reply